Kremer Addition,Kitchen,& Miscellaneous Remodeling
Email Email Facebook Twitter MySpace

 

July 12, 2010

Existing Kitchen

July 12, 2010

Existing Kitchen

July 12, 2010

Existing Dining Room/Entry

July 12, 2010

Kitchen Landing

July 12, 2010

Kitchen & steps to hallway

July 12, 2010

Preparing for excavation

July 12, 2010

Saw cutting the concrete driveway

July 12, 2010

Saw cutting and jack hammering the existing concrete step

July 12, 2010

Starting to dig the hole

July 12, 2010

Digging completed. Tomorrow we pour footings and lay block.

July 14, 2010

Block work is complete

July 14, 2010

Ready to start building

July 16, 2010

Front Porch Rocks!!!

July 16, 2010

Dumpster being delivered. Lumber was delivered today too.

July 16, 2010

Demo has started. We will start building the addition on Monday.

July 19, 2010

Starting the framing

July 20, 2010

The addition is framed up

July 21, 2010

Roofing installed today

July 22, 2010

The old cabinets are gone!

July 22, 2010

Demo prep

July 26, 2010

The kitchen demo is complete.

July 26, 2010

Today we met with the structural engineer. Pretty soon these load-bearing walls will be gone.

July 26, 2010

The Kremer's are great!! We love working here!

July 28, 2010

Wall demo is moving along

July 28, 2010

Installing the beams in the kitchen ceiling

July 28, 2010

Bathroom demo has started.

July 29, 2010

August 02, 2010

Bathroom demo is complete

August 02, 2010

The electrician is removing existing wiring.

August 03, 2010

Structural beams are being installed.

August 03, 2010

Things are opening up!

August 03, 2010

The temporary support walls will come down tomorrow

August 03, 2010

The wall between the kitchen and the new mudroom addition will be gone soon.

August 05, 2010

The wall is gone

August 05, 2010

Framing is almost complete. Mechanical rough-ins are next

August 06, 2010

The beams are all in place!

August 06, 2010

View from new mudroom

August 13, 2010

Weld Plumbing Rough-in day

August 13, 2010

Plumbing the main floor bath - lots of pipes & wires!

August 13, 2010

Brian starting the electrical rough-in for the kitchen

August 13, 2010

The new electrical inspector ??

August 16, 2010

Insulation today

August 16, 2010

Spray foam insulaion in the walls. All the mechanical inspections and the framing inspection passed today. Drywall starts tomorrow

August 18, 2010

Drywall has started

August 18, 2010

Drywall

August 20, 2010

New Marvin windows

August 20, 2010

Kitchen

August 23, 2010

New windows in the living room

August 23, 2010

What a change to the front of the house!

August 23, 2010

Drywall is in process

August 25, 2010

Family room ceiling is retextured

August 26, 2010

Finishing window install

August 27, 2010

A little road construction added to the mix.

August 30, 2010

Hardwood flooring being installed in the family room

August 30, 2010

Bathroom tile prep started today. Big changes on the way!

August 31, 2010

Installing the kitchen flooring

August 31, 2010

Sanding the family room floors

August 31, 2010

Installing tile in the shower

August 31, 2010

Some final exterior finishing to get ready for stucco

September 01, 2010

Hardwood is in...sealing process has begun!

September 01, 2010

Family room floor looks great

September 06, 2010

Family Room furniture is moved back in

September 06, 2010

Kitchen floor is sanded and sealed with two coats.

September 06, 2010

Bathroom tile is looking great

September 07, 2010

Installing the bathroom floor tile

September 07, 2010

Shower floor

September 08, 2010

Ceiling lift track was installed today

September 10, 2010

The Memphis Wood Fire Grill

September 10, 2010

Pella door will be installed here soon

September 13, 2010

laying out the slate floor in the mudroom

September 13, 2010

Slate floor looking good

September 14, 2010

We will grout the floor tomorrow

September 14, 2010

Installing the prehung doors

September 14, 2010

Installing slate around the fireplace. Kitchen cabinet install starts tomorrow.

September 15, 2010

Cabinets are here!!

September 15, 2010

The Bella install team

September 15, 2010

Cabinet install

September 15, 2010

Refrigerator and oven cabinets

September 15, 2010

Stairway work.

September 17, 2010

Getting ready for the new Pella door

September 17, 2010

Installing the wire lath for the stucco scratch coat

September 17, 2010

Cabinet install continues.

September 17, 2010

The cabinets are looking great.

September 17, 2010

Crown and detail trim is next

September 20, 2010

The slate floor by the pool enterance

September 20, 2010

Cabinets are looking great

September 20, 2010

Range and hood area

September 20, 2010

Granite is ordered. Painting and glazing is next

September 20, 2010

Bella Custom Cabinetry does great work!

September 20, 2010

Oak cabinetry in the mudroom

September 27, 2010

September 27, 2010

Glazing the kitchen cabinets

September 27, 2010

More glazing. Tomorrow the clear coat goes on!

September 27, 2010

The new front door was installed on Friday

September 27, 2010

Big changes to the front of the house!

September 27, 2010

The bathroom is just about complete.

September 28, 2010

September 29, 2010

Installing the Pella sliding glass door

October 01, 2010

Stucco scratch coat being installed

October 01, 2010

Jason is hanging the new back door

October 01, 2010

The glazing on the cabinets is complete

October 01, 2010

Cabinet glaze

October 01, 2010

Looking good!

October 01, 2010

Finishing touches on the window finishing

October 01, 2010

The dogs find this whole remodeling thing to be pretty relaxing!

October 04, 2010

Granite was installed today

October 04, 2010

Granite looks great.

October 05, 2010

Building the back deck and steps

October 06, 2010

Wood floors will be finished this week

October 08, 2010

Ready for appliances, plumbers and electricians next week!

October 08, 2010

We are closing in on the final details!!

October 11, 2010

Back landing and steps

October 11, 2010

Installing the tile backsplash

October 12, 2010

Appliances installed today

October 12, 2010

Backsplash above the Wolf range

October 12, 2010

Grouting

October 13, 2010

Backsplash is completed

October 13, 2010

The glass tile looks awesome

October 14, 2010

The hood is wired up and working

October 14, 2010

The under counter lights were installed today.

October 14, 2010

It's move-in time for the kitchen

October 18, 2010

Looking great

October 18, 2010

Dining Room

October 18, 2010

Only a few little details left to complete

October 18, 2010

Living Room